Marine projects

Carmel Port

The Project

Haifa’s Carmel Port – is part of the Port of Haifa expansion plan.

The new terminal construction was completed in May, 2009. The 1.2 Billion NIS project includes the construction of 1,800 meter mooring quays with waterside maximum depth of 15.5 meters, 225,000m2 land reclamation, 2,500,000m3 dredging, 120,000m2 of paved area including infrastructures, 112,000m2 of brick tiled areas and 20,000 tons sheet pile driving. The new terminal will be equipped with super post-Panamax cranes and rail mounted container stacking cranes.