Marine projects

Beach reclamation using conveyor sand supply

The Project

General description

Transfer of 400 000 tons of sand from sand quarry in the Rotem through the temorarry storage area via conveyor to the Ashkelon beach.

ADYR Construction are responsible for Project Management and coordination for sand transfering to the beach which includes among other elements:

  • Construction of 60 meter length conveyor for transfering sand from temorary storage to the beach
  • Renewing the beach line using 400 000 tons of sand