loading
Completion
77%
Hadarom Port Terminal
Completion
88%
Hamifraz Port Terminal
General Description The works include the construction of a 380 acre container terminal that will be operated by private concessionaire. Description of work - Currently, the Basic and Detail design...
Completion
100%
OPC Rotem
OPC Rotem is a Power Plant that operates with natural gas in a combined cycle. The Power Plant includes two turbines. A Gas Turbine and a Steam Turbine, both connected...
Completion
94%
Jaffa Port – Replacement of Wharf 5 and Wharf 8
Replacement of Wharf 5 (Floating dock) and Wharf 8 (Platform on piles) with new state of the art structures.
Completion
94%
Jaffa Port–Rehabilitation of existing Lee Break Water
Rehabilitation of an existing Break Water at the entrance to Jaffa Port.
Completion
94%
Geotube breakwater
Construction of 800 meter geoutube breakwater
Completion
100%
Hadera disalination plant – repair of intake pipeline
Replace of damaged HDPE Intake pipeline ADYR Construction were responsible for Project Management, Design Coordination, underwater inspection and Quality Assurance of all related works...
Completion
28%
Beach reclamation using conveyor sand supply
Sand transfer from the site of sand quarry in the Rotem through the temorarry storage area to the Ashkelon beach.
Completion
88%
Zikim Groyne and Defensive fence
General Description ADYR Construction are responsible for Project Management and coordination for construction of the new Groyne at Zikim beach which includes among other elements: • Construction of roble-mound Groyne...
Completion
100%
P88 – Pumping Station
A mega pumping station which delivers brine from the northern Dead Sea towards the manufacturing plants. Five powerful water pumps with 5,000Hp each were installed. The project involved erecting large...